Posted on

Maximo v7.6 Product Document 

Predictive and Preventive Maintenance (10%)

The objectives of this section are:

  1. Explain the use of Master PMs
  2. Describe how to configure the various types of PMs
  3. Identify using Routes
  4. Describe how to generate and modify a PM forecast
  5. Describe how Condition Monitoring can be configured to generate work orders
  6. Describe time based and meter based PMs
  7. Apply job plan sequencing to PMs
Leave a Reply

Your email address will not be published. Required fields are marked *